Calculate the total earthwork required to build a road embankment with dimensions 100 meters in length, 8 meters in top width, side slope of 1:1 and a height of 2 meters.
If the numerator of fraction is increased by 200% and the denominator is increased by 350%. The resultant fraction is What was the original fractions?